Still under environmental review, plans are still being made for the bus rapid transit line that would connect North Hollywood and Pasadena.

Plans for the controversial North Hollywood-Pasadena bus rapid transit (BRT) line paint a picture of an 18-mile corridor that would travel through North Hollywood, passing through Burbank and Glendale, ending in Pasadena with a 66 minute end-to-end trip time.
"The project, which is currently in its environmental review period, covers an approximately 18-mile corridor which spans the communities of North Hollywood, Burbank, Glendale, Eagle Rock, and Pasadena. An estimated 700,000 daily trips occur within the project area, which includes the SR-134 freeway," summarizes Steven Sharp after a November 4th meeting of Metro's San Fernando Valley Service Council.
So far, plans have the buses running ten minutes apart during peak hours and with a headway between 15 and 30 minutes during off-peak periods. "Metro is planning between 21 and 23 stations, depending on the chosen alignment, and anticipates 30,000 daily riders upon opening," Sharp reports.
The alignment of the route is still to be determined. Options include Colorado Boulevard, Glenoaks Boulevard, Olive Avenue, Riverside Drive, and Lankershim Boulevard, says Sharp.
To date, Metro has attained about $267 million in funding, almost 90% of the total cost of the project. If all goes according to plan, construction will begin in 2024.
FULL STORY: Here's a Look at the North Hollywood-Pasadena Bus Rapid Transit Line

Analysis: Cybertruck Fatality Rate Far Exceeds That of Ford Pinto
The Tesla Cybertruck was recalled seven times last year.

National Parks Layoffs Will Cause Communities to Lose Billions
Thousands of essential park workers were laid off this week, just before the busy spring break season.

Retro-silient?: America’s First “Eco-burb,” The Woodlands Turns 50
A master-planned community north of Houston offers lessons on green infrastructure and resilient design, but falls short of its founder’s lofty affordability and walkability goals.

Test News Post 1
This is a summary

Analysis: Cybertruck Fatality Rate Far Exceeds That of Ford Pinto
The Tesla Cybertruck was recalled seven times last year.

Test News Headline 46
Test for the image on the front page.
Urban Design for Planners 1: Software Tools
This six-course series explores essential urban design concepts using open source software and equips planners with the tools they need to participate fully in the urban design process.
Planning for Universal Design
Learn the tools for implementing Universal Design in planning regulations.
EMC Planning Group, Inc.
Planetizen
Planetizen
Mpact (formerly Rail~Volution)
Great Falls Development Authority, Inc.
HUDs Office of Policy Development and Research
NYU Wagner Graduate School of Public Service