The original tile and brick sidewalks now pose safety hazards and don’t fully serve modern accessibility and mobility needs.

A project to repair 108 blocks of sidewalks around New York City’s Central Park will make them more accessible to people using wheelchairs, strollers, and other mobility devices.
As Anna Kodé explains the The New York Times, the granite blocks and asphalt tiles in the century-and-a-half year old sidewalks now pose safety and accessibility hazards. “When the paved sidewalks were originally being installed in the 1930s, over 70 years after the first section of the park opened to the public, there were no electric scooters, Citi Bikes or people getting in and out of Ubers. Natural impediments have cropped up, too: Overgrown tree roots push up sections of the sidewalk, and pools of storm water collect in its dips.”
Now, the Central Park Conservancy is undertaking a massive restoration project that aims to balance preservation with accessibility. The group plans to restore some of the original design patterns while enhancing accessibility and safety, as well as preserving the park's elm trees, one of the largest stands remaining in the country. “The park’s prized American elm trees are a large part of why the restoration will take years to complete. The conservancy planted 58 new trees around the perimeter and is taking care to disturb the existing roots as little as possible as it installs the new sidewalk blocks and benches.”
FULL STORY: Fixing Central Park’s Bumpy Sidewalks

Analysis: Cybertruck Fatality Rate Far Exceeds That of Ford Pinto
The Tesla Cybertruck was recalled seven times last year.

National Parks Layoffs Will Cause Communities to Lose Billions
Thousands of essential park workers were laid off this week, just before the busy spring break season.

Retro-silient?: America’s First “Eco-burb,” The Woodlands Turns 50
A master-planned community north of Houston offers lessons on green infrastructure and resilient design, but falls short of its founder’s lofty affordability and walkability goals.

Test News Post 1
This is a summary

Analysis: Cybertruck Fatality Rate Far Exceeds That of Ford Pinto
The Tesla Cybertruck was recalled seven times last year.

Test News Headline 46
Test for the image on the front page.
Urban Design for Planners 1: Software Tools
This six-course series explores essential urban design concepts using open source software and equips planners with the tools they need to participate fully in the urban design process.
Planning for Universal Design
Learn the tools for implementing Universal Design in planning regulations.
EMC Planning Group, Inc.
Planetizen
Planetizen
Mpact (formerly Rail~Volution)
Great Falls Development Authority, Inc.
HUDs Office of Policy Development and Research
NYU Wagner Graduate School of Public Service