While the photos of the flooded towns in New England captivated our attention, it is the devastation to the roads and bridges that has become the priority in the rebuilding effort - as they must be repaired or replaced to allow relief and rebuilding.
Roads and bridges are to rural New England what transit is to New York City - they provide the backbone for all the towns and hamlets that were hard-hit by Hurricane Irene. To complicate matters, Vermont's Agency of Transportation must rebuild, repair, or replace the damaged road infrastructure before winter's snow and frost arrives - in about two and half months, as the ground freezes, thus making construction very difficult.
"Of all the challenges facing Vermont as it tries to recover from the floods caused by the remnants of Hurricane Irene, there may be none more daunting - or vital to solve - than repairing and reopening the hundreds of roads and dozens of bridges that the storm knocked out. In many spots, the roads must be fixed before equipment can be brought in to repair everything from homes and businesses to the power grid, railroad tracks and water and wastewater systems."
"Faced with so much devastation, state officials are taking a triage approach. The first order of business was restoring access to 13 towns that were isolated when the roads and bridges were washed out. They did this by building what state officials call "goat paths," pouring gravel and sand and storm debris onto washed-out roads, and flattening them until they were strong enough for emergency vehicles to get over them."
FULL STORY: Battered Vermont Looks First to Its Roads

National Parks Layoffs Will Cause Communities to Lose Billions
Thousands of essential park workers were laid off this week, just before the busy spring break season.

Retro-silient?: America’s First “Eco-burb,” The Woodlands Turns 50
A master-planned community north of Houston offers lessons on green infrastructure and resilient design, but falls short of its founder’s lofty affordability and walkability goals.

Delivering for America Plan Will Downgrade Mail Service in at Least 49.5 Percent of Zip Codes
Republican and Democrat lawmakers criticize the plan for its disproportionate negative impact on rural communities.

Test News Post 1
This is a summary

Test News Headline 46
Test for the image on the front page.

Balancing Bombs and Butterflies: How the National Guard Protects a Rare Species
The National Guard at Fort Indiantown Gap uses GIS technology and land management strategies to balance military training with conservation efforts, ensuring the survival of the rare eastern regal fritillary butterfly.
Urban Design for Planners 1: Software Tools
This six-course series explores essential urban design concepts using open source software and equips planners with the tools they need to participate fully in the urban design process.
Planning for Universal Design
Learn the tools for implementing Universal Design in planning regulations.
EMC Planning Group, Inc.
Planetizen
Planetizen
Mpact (formerly Rail~Volution)
Great Falls Development Authority, Inc.
HUDs Office of Policy Development and Research
NYU Wagner Graduate School of Public Service