Whether you call it the Louisville-Southern Indiana Ohio River Bridges Project, the Downtown Crossing, or the new Spaghetti Junction—call it done.

"With the opening of the East End bridge on Sunday and the official start of tolling set for Friday, Dec. 30, construction of the $2.3 billion Louisville-Southern Indiana Ohio River Bridges Project has pretty much concluded," according to an article by Michael Finley.
"To recap, the bridges project had two major components in the downtown crossing, which included reconfiguring Spaghetti Junction, and the East End crossing, which includes the East End bridge and new roads and tunnels to connect to the bridge," explains Finley. Finley's article provides a retrospective of the project's long construction process.
The Downtown Crossing portion of the project wrapped up construction in November, as reported by Sheldon S. Shafer in a separate article for the Courier-Journal. Earlier this month, the Courier-Journal also commemorated the project by posting aerial images of the completed Spaghetti Junction. Walsh Construction, lead contractor on the project, working with the states of Indiana and Kentucky, also posted a celebratory blog post announcing the end of construction back in November. That project lists the goals and priorities for the project, from the obvious pro-construction perspective of the development team.
For a much more critical take on the pro-highway politics that approved and funded the project, revisit a post by New York Times architecture Michael Kimmelman, who visited the city in 2012.
FULL STORY: From start to finish: One last look at the Downtown Crossing construction

Analysis: Cybertruck Fatality Rate Far Exceeds That of Ford Pinto
The Tesla Cybertruck was recalled seven times last year.

National Parks Layoffs Will Cause Communities to Lose Billions
Thousands of essential park workers were laid off this week, just before the busy spring break season.

Retro-silient?: America’s First “Eco-burb,” The Woodlands Turns 50
A master-planned community north of Houston offers lessons on green infrastructure and resilient design, but falls short of its founder’s lofty affordability and walkability goals.

Test News Post 1
This is a summary

Analysis: Cybertruck Fatality Rate Far Exceeds That of Ford Pinto
The Tesla Cybertruck was recalled seven times last year.

Test News Headline 46
Test for the image on the front page.
Urban Design for Planners 1: Software Tools
This six-course series explores essential urban design concepts using open source software and equips planners with the tools they need to participate fully in the urban design process.
Planning for Universal Design
Learn the tools for implementing Universal Design in planning regulations.
EMC Planning Group, Inc.
Planetizen
Planetizen
Mpact (formerly Rail~Volution)
Great Falls Development Authority, Inc.
HUDs Office of Policy Development and Research
NYU Wagner Graduate School of Public Service