Stormwater Improvements Linked to Freeway Project in Northeast Denver

The funding needed to complete the Two Basin Drainage Project in Denver would come as a package deal with a $1.2 billion plan to overhaul I-70. Residents are concerned that they might be getting more than they bargained for.

1 minute read

July 11, 2015, 11:00 AM PDT

By James Brasuell @CasualBrasuell


The Two Basin Drainage Project would spend $173 million in building stormwater infrastructure for "repeatedly waterlogged" areas like Park Hill, Elyria-Swansea, and River North in northeast Denver. The city's plan would address the area's lack of sufficient storm sewers in two drainage basins that channel runoff to the South Platte River.

According to an article by Jon Murray, however, the funding for the Two Basin Drainage Project comes with a significant hitch: "Part of its funding is tied to the controversial Interstate 70 project," which would spend $1.2 billion to replace a 50-year-old viaduct between Colorado and Brighten boulevards with a widened, below grade stretch of freeway. Though the drainage project is supported by the community, the 1-70 project is far from a sure thing.

Murray covers more of the politics at play in the decision to link the two projects as well as more of the planning and design details behind the drainage project.

Sunday, July 5, 2015 in The Denver Post

portrait of professional woman

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching. Mary G., Urban Planner

I love the variety of courses, many practical, and all richly illustrated. They have inspired many ideas that I've applied in practice, and in my own teaching.

Mary G., Urban Planner

Get top-rated, practical training

Close-up of park ranger in green jacket and khaki hat looking out at Bryce Canyon National Park red rock formations.

National Parks Layoffs Will Cause Communities to Lose Billions

Thousands of essential park workers were laid off this week, just before the busy spring break season.

February 18, 2025 - National Parks Traveler

Paved walking path next to canal in The Woodlands, Texas with office buildings in background.

Retro-silient?: America’s First “Eco-burb,” The Woodlands Turns 50

A master-planned community north of Houston offers lessons on green infrastructure and resilient design, but falls short of its founder’s lofty affordability and walkability goals.

February 19, 2025 - Greg Flisram

Small rural USPS post office in manufactured one-story grey building with American flag in front.

Delivering for America Plan Will Downgrade Mail Service in at Least 49.5 Percent of Zip Codes

Republican and Democrat lawmakers criticize the plan for its disproportionate negative impact on rural communities.

February 12, 2025 - Cowboy State Daily

Chicago

Test News Post 1

This is a summary

April 8 - 2TheAdvocate.com

test alt text

Test News Headline 46

Test for the image on the front page.

March 5 - Cleantech blog

Military humvee driving through gate at Fort Indiantown Gap Natl Guard training center in Pennsylvania surrounded by winter trees and dead leaves.

Balancing Bombs and Butterflies: How the National Guard Protects a Rare Species

The National Guard at Fort Indiantown Gap uses GIS technology and land management strategies to balance military training with conservation efforts, ensuring the survival of the rare eastern regal fritillary butterfly.

February 24 - Esri Blog